Carbon Disulfide

CS2 Plant Project

Posted Posted in Updates

Maurer is currently engineering and supplying a latest state of the art Carbon Disulfide Production plant in conjunction with an Acid Gas Treatment plant. The chosen process-technology yields highest efficiency at low investment cost whilst incorporating full environmental protection.

Scale-Up of Cellulosic Aligner Discs for Medical Application

Posted Posted in Updates

We have the opportunity to engineer the next scale of production together with our customer Bottmedical (Basel, Switzerland). Bottmedical has developed a unique production process for the manufacture of natural aligner discs, the base for a dentist to create ones personalized dental aligner for most comfortable teeth corrections. The outstanding feature of such discs is […]

Stretching Rollers

Posted Posted in Updates

Maurer has been challenged to redesign the Metall Stretching Rollers for one of its clients on several lines. The newly designed Rollers incorporate latest material developments and combine it with most suitable design. This saves weight and brings maintenance down significantly.

Cellophane Lip

Cellophane Casting Lips

Posted Posted in Sales, Updates

We were able to deliver a set of brand new Cellophane Casting Lips. Made of special alloy guaranteeing highest corrosion resistance and durability of the material. This results in reduced maintenance efforts and leads to higher product quality. Maurer is crafting those masterpieces exclusively for our customers since more than eighty years.

Laboratory Plant

Posted Posted in Sales, Updates

Maurer is engineering, manufacturing and starting-up a complete laboratory plant for the production of regenerated cellulosic fibre, especially viscose. The laboratory plant is able to simulate the industrial process on a much smaller scale to suit laboratory applications. It is at a high level of automatization and covers the production chain from pulp shredding to […]

Basic Design for Exhaust System

Posted Posted in Sales, Updates

Maurer is about to engineer a complete Basic Design for an Exhaust System. The capacity of this project is 600 tons per day of viscose staple fibre. Maurer is about to take care of: the complete design basis mass balances process flow diagrams piping and instrumentation diagrams control logics and interlocks specifications of key equipment […]